
Strategy and Planning
Start with what students need, decide how your program will work, then plan how to get it done.
Jump to Section
Good programs start with good questions. This section walks you through three steps: assess your needs, decide your strategy, and plan your program. Each step has a short guide on what to understand and what to avoid, plus a worksheet that turns your thinking into something you can use and share. Start wherever you are. If you already know your needs, jump to strategy. If you have a strategy, go straight to planning. And expect to come back: as your program grows, your needs will change, and the right answers will change with them. That’s a sign the work is going well.
Select where you currently are to see your recommended path:
You have a sense that students need technology, but not yet a clear picture of what they need or why. Start with Step 1: Assess Your Needs.
Start with what students actually need, not with a feeling or an anecdote.
Every later choice depends on this one. If you cannot say who the technology is for, what they need to do with it, and how you know, you will end up choosing devices and software first and finding the purpose afterward. That is true for a brand-new program and just as true when you are scaling or changing one you already run.
What to understand
• A need is a gap you can describe, not a product you want. "Students need tablets" is a solution. "Students cannot complete coursework between class sessions" is a need.
• Look at what you already have. Enrollment, completion, wait lists, help requests, device logs and staff notes are all evidence. Take stock before you collect anything new.
• Ask the people closest to the problem. Students, instructors, facility staff and IT see different parts of it. Plan to hear from each, and note whose voice is missing.
• Check your readiness. The seven success factors in our guide work as a readiness check. Look for the ones where you are weakest, since those are where programs tend to stall.
Mistakes to avoid at this step
• Technology before planning. Buying or piloting devices before you have defined the need.
• Ignoring staff resistance. Staff who were not heard early often stop a program later.
What you produce
A one-page needs statement: who the program serves, what gap it addresses, the evidence behind that, and what you still do not know. Done when someone outside your project can read it and tell you what problem you are solving.
Guides for this step
• Conducting a Needs Assessment: a step-by-step approach, with a short first pass for when you are short on time.
• What Makes Implementation Succeed or Fail: the seven success factors, used as a readiness check.
Worksheet: Implementation Worksheet
Choose how your program will work, and who gets a say, before you plan the details.
Planning answers "how do we do this and when?" Strategy answers the questions that come first: what is this for, who controls it, and what are we willing to trade away? Programs that skip this step still make these choices. They make them by default, usually through whatever was easiest at the moment, and then live with the results.
There is no single right strategy. The right one depends on your goals, your agency's rules and your funding. Where this toolkit recommends something, it says whether that is established evidence, a recommendation that holds if your goal is a particular one, or Unlocked Labs' own position and why.
What to understand: seven decisions every program makes
1. Purpose. What the technology is for, and what it is not for.
2. Control. Who owns and manages the devices, the network and the content.
3. Access and monitoring. Who can use what, when, and how use is watched.
4. Scope and sequence. How much you start with, and what has to be true before you grow.
5. Dependency. What you rely on from vendors, partners and a single funding source, and what happens if it ends.
6. Data. What you collect, who can see it, and whether you can get it out of your systems.
7. Decision rights. Who gets a say in shaping the strategy, and who simply approves it.
Decide who has a say
Formal authority is not the same as a voice in shaping strategy. Someone with great power over your program may only need to approve it. Others, such as instructors, IT staff and facility leadership, may need to help shape it. Whoever starts the project should decide, on purpose, who is in which group. That includes whether students will share in decisions and how far. The toolkit asks you to make this choice. It does not require a particular answer.
Partnerships and approvals show up twice. At this step you decide whom to involve and how much say they get. At Step 3 you plan when to approach them and how to prepare.
Mistakes to avoid at this step
• Pilot without a scale plan. Starting small with no idea what would justify growing.
• Vendor lock-in. Choosing a platform you cannot leave.
• Unsustainable funding. Building on money that ends before the program does.
• Measuring activity, not outcomes. Counting logins instead of learning.
• Criteria with no data access. Setting goals you have no way to measure.
• Deciding by default. Letting one of the seven decisions get made for you.
What you produce
A strategy statement of one page: your diagnosis of the situation, the seven choices you made and why, who is shaping versus approving, and the criteria that will tell you whether to scale, change or stop. Each criterion must name the data you will use to judge it. Done when someone could use it to say no to a good idea that does not fit.
Guides for this step
• Making Strategic Choices (coming soon): explains strategy versus planning, walks through the seven decisions, and helps you write the strategy statement.
• Getting the Data Out of Your Systems (coming soon).
Worksheet: Implementation Worksheet, Phase 1.6: Findings, Decision Rights and Draft Criteria
Turn your strategy into a budget, a schedule, approvals and tasks someone can own.
By now you know the need and the choices you made. Planning is where those choices meet the calendar and the budget. A good plan can be handed to someone who was not in the room and still be followed.
What to understand
• Implementation happens in phases. Assess, build partnerships, plan, then pilot and review. Each phase has a gate, and you should know what has to be true to pass it before you start.
• Approvals are a series of conversations, not one hurdle. Step 2 settled whom to involve and how much say they get. Here you plan when to approach each person or office, what information you need first, and how to prepare the ask.
• Budget over the life of the program. Include devices, network, support staff, training, content and evaluation, and what happens when startup funding ends.
• Plan your data. Decide what you will collect, how you will store and protect it, and how you will get it out when you need to report or evaluate. This is how your Step 2 criteria become measurable.
Mistakes to avoid at this step
• Underestimating security approvals. They often take longer than anything else on the schedule.
• Single point of failure. One champion, one vendor or one staff member holding the program together.
• Insufficient IT capacity. A plan that assumes support nobody has been assigned to provide.
• Ignoring reentry. Forgetting what students can carry forward after release.
What you produce
A program plan: phases and gates, a budget, an approval schedule with who prepares what, a data plan, and named owners for each task. Done when you can name your next three actions, who owns them and by when.
Guides for this step
• Program Planning Fundamentals (coming soon): phases, timelines and the first 90 days.
• Approval Chains: who has to say yes, in what order.
• Budget Planning Complete: full-cost budgeting.
Worksheet: Implementation Worksheet, Phases 2 and 3: Build Partnerships and Plan
Strategy and planning are not one-time work. Once your program is running, review it against the criteria you set in Step 2. If the evidence says to scale, change or stop, return to Step 1 with what you have learned and go through the steps again. The loop is the point: a program that never revisits its strategy is acting on decisions nobody intentionally made.
Step 1: Assess
• Conducting a Needs Assessment
• What Makes Implementation Succeed or Fail
Step 2: Decide
• Making Strategic Choices (Soon)
• Getting data out of your systems (Soon)
Step 3: Plan
• Program Planning Fundamentals
• Budget Planning
Across all steps
See role-specific guidance for colleges, universities, and educational organizations
For Higher Education in Prison ProvidersSee role-specific guidance for wardens, DOC staff, and facility leadership
For Corrections AdministratorsStart with implementation success factors - foundation for all roles
What Makes Implementation Succeed or FailIdentify your challenge and potential solutions
Common Failure ModesRealistic Timeline
This is often a 12-24 month process from concept to launch , depending on the size and scope of your program. Make sure you're being realistic about approval processes, procurement timelines, and proper setup.
Expect Resistance
You will face resistance and setbacks. This is normal. Successful programs persist through challenges, not because they encountered none.
Start Small
Pilot programs prove the concept with manageable risk and investment. Use pilot success to build support for scaling.
Engage Security and Operations Early
Engage corrections security and line staff early. Their input produces better, more secure programs and builds the support you absolutely need. Don't treat security as an obstacle to overcome. Treat it as a design parameter to work within. Don't forget that the people tasked with the movement of people and materials through the facility can help things run smoothly or not.
Evidence Over Passion
Evidence matters more than passion. However much you believe in this work, stakeholders need data showing it works safely and effectively. Build evaluation into your program from the start.
Perfect is the Enemy of Good
Don't wait for ideal conditions. Start with what's possible now, demonstrate success, and expand capabilities over time.