What Makes Technology Implementation Succeed or Fail
Jump to Section
Technology implementation in correctional settings is really a policy, partnership, and change management challenge that happens to involve technology. Success depends on navigating the complex relationships between correctional agencies, higher education programs, technology providers, and various oversight bodies, each with legitimate but sometimes competing priorities.
Programs succeed when:
- Agency leaders provide explicit support and champion the initiative
- Policies enable technology while maintaining security
- Security requirements are understood and appropriately applied
- Key stakeholders are engaged early and often
- Partnerships are strategic and mutually beneficial
- Correctional staff are included in planning stages
- Implementation is phased and responsive to feedback
- Students are involved in shaping the program from the beginning
Rate your program on each of the 7 critical success factors. Be honest — this is for your planning, not for external reporting.
Leadership commitment
Security integration
Adequate infrastructure
Sustainable funding
Staff capacity & training
Student preparation
Outcomes measurement
Programs with 5+ Strong ratings are ready to scale. Programs with 2+ Needs Work ratings should address those gaps before expanding. No program launches perfectly — use this to prioritize attention.
Implementation rarely goes perfectly. Here are responses to common obstacles:
❝"We tried technology before and it failed"+
- • Ask what specifically didn't work: was it technical, operational, or political?
- • Share how other programs overcame similar challenges
- • Propose a pilot with those lessons learned explicitly applied
❝"Security will never approve this"+
- • Engage security staff early in the planning process, not after decisions are made
- • Show examples from similar-security facilities
- • Propose robust security controls designed with their input
- • Listen to their concerns; they often identify real risks that others miss
❝"We don't have budget for this"+
- • Explore grant opportunities
- • Propose partnerships that share costs between education and corrections
- • Show long-term ROI and cost savings from reduced recidivism
- • Consider alternative procurement models that provide options beyond traditional state procurement processes
❝"IT says it's too complicated"+
- • Bring in technical assistance from organizations experienced in correctional technology
- • Show that other facilities with similar infrastructure succeeded
- • Start with the simplest viable approach and build complexity gradually
- • Clarify whether "too complicated" means insufficient staff, inadequate infrastructure, or lack of expertise (different problems need different solutions)
❝"Staff don't want technology in the facility"+
- • Listen to specific concerns without being defensive—resistance often signals legitimate worries
- • Provide thorough training that addresses their actual concerns
- • Start with the most enthusiastic staff members as champions
- • Celebrate early successes publicly to build momentum and demonstrate value
Introduction
A program plan turns the choices in your strategy statement into a sequence of work, a schedule, and named people who own each piece. It answers "in what order, by when, and who does what?" so that someone who was not in the room can carry it out.
Every program has different approvals, funding, staff and facilities, so the right order and pace come from your own needs statement and strategy statement. What the guide gives you is questions to answer, and ways to check your answers.
By the end you will have a plan that covers:
What has to happen, in what order, and what has to be true before each phase starts.
A timeline built from your own constraints, not from a generic calendar.
Who does what, including who approves.
When you will approach each partner and office, and what they will need from you.
A budget, and the staff capacity to deliver it.
The data you will collect to judge your Step 2 criteria.
What you will do when something changes.
Who needs to know what, and when.
This guide belongs to Step 3 of Strategy and Planning. If you do not yet have a needs statement and a strategy statement, start with Step 1 and Step 2. A plan built without them tends to be a detailed schedule for a program nobody has agreed on.
1Before you start: gather your Step 1 and Step 2 work▼
Planning starts with what you have already decided, so bring six things to the table before you write anything.
- • If one of these is missing or vague, write that down now. A gap you can name is a task you can assign. A gap you ignore tends to turn into a surprise partway through. The Implementation Worksheet is one place to capture what you know about your facility, partners and delivery model.
How your strategy shapes your plan
Each of the seven choices you made in Step 2 adds work to your plan, and your answers decide what that work is. Use this table to find the tasks your own choices create. Where your answer to a question is "we do not know yet," that is a task.
Sequence: decide the order before you pick dates
Put your tasks in order by what depends on what, and only then think about calendar dates. Starting a task before the thing it depends on is finished tends to cause delays.
List the work. Start with the tasks your seven choices created in the table above, and add what you learned in Step 1. Write each task as an action and a result, such as "Device policy written and approved by facility leadership."
Group the work into phases. A phase is a set of tasks that together give you something you can check. Your Step 2 choice on scope and sequence tells you how much goes in the first phase and what has to be true before the next one.
Ask two questions about every task. What has to be finished before this can start? What cannot start until this is finished? Draw the answers as arrows between tasks, on paper or a whiteboard.
Mark the gates. A gate is a point where someone decides whether to go on. For each one, write down what has to be true, who decides, and what evidence they will look at. Your Step 2 criteria are a good source for this. The Ready to Launch Checklist is one example of a gate check before launch.
Mark what other people control. Approvals, purchases, hiring and facility schedules are usually not in your hands. They set the pace for everything that depends on them.
Look for the longest chain. Find the string of dependent tasks that takes the most time end to end. It sets the earliest your program can reach its goal. Tasks that are not on that chain can run alongside it.
Here is an illustration, not a recommendation. A program that chose corrections-managed devices may find that network access has to be approved before devices can be ordered. A program that chose vendor-managed devices may find that the contract comes first. The same task lands in a different place depending on the choice you made in Step 2.
Published models can give you vocabulary. The Ithaka S+R implementation playbook describes three phases for technology in higher education in prison, and the EPIS framework from implementation science describes four. Neither says how long a phase should take. Your timeline has to come from your own constraints.
Timeline: attach dates to your sequence
A timeline is your sequence with dates on it. Build the dates from your own fixed deadlines, your partners' calendars, and what similar work has taken you before, not from a generic schedule. The same task can take a few weeks in one agency and much longer in another.
Start with the dates you cannot move. These include funding start and end dates, budget cycles, reporting deadlines, academic terms, contract renewals, and the days facilities restrict movement or visitors. Place them first and fit everything else around them.
Ask the people who control the pace. For each task someone else controls, ask how long it usually takes, when they meet or decide, and what they need from you before they can start. Write down who gave you the answer.
Use your own history. If you or a partner has done something similar, what did it actually take? If no one has, say so in the plan and use a range instead of a single date.
Use ranges where you are unsure. Give an earliest and a latest finish. For an approval you do not control, plan the date you will ask by, not the date you expect an answer.
Place buffer where it matters. Put extra time on tasks with the most uncertainty and on tasks on your longest chain, since a delay there delays everything after it. Spreading buffer evenly across every task hides where the risk is.
Check dates against people. If the same person owns four tasks in the same month, the plan has a capacity problem. The roles section below shows how to find it.
Decide what happens when a date slips. Name which gates move, who must be told, and who decides whether to cut scope or wait.
A working timeline usually has one row per task. These columns are a starting point, so add or drop any that do not help you:
2Roles: who does what▼
Give every task one named owner, and be clear about who decides. A task owned by "education" or "IT" is a task nobody owns. Your Step 2 decision rights, where you separated people who shape the strategy from people who approve it, are the starting point.
Name people, not departments. Write a person's name next to each task. If you do not know who it will be yet, name the person who will find out, and give a date. The toolkit's sample job descriptions may help you define roles that do not exist yet.
Separate doing from answering for. The person who does the work and the person who is accountable for it are sometimes different. A simple way to show this is a RACI chart. For each task, mark who is Responsible (does the work), who is Accountable (answers for the result), who is Consulted (gives input first) and who is Informed (is told afterward). The UCSF project office's guide suggests one Responsible and exactly one Accountable per task.
Carry your Step 2 decisions into the chart. The people who shape your strategy are usually the ones to consult before a decision. The people who approve it are the ones accountable for the sign-off. If you decided students will share in some decisions, name which ones here. The Ithaka S+R playbook's sample stakeholder list includes a student voices committee, as one example of how that can look.
Name a backup for the tasks that matter most. If one person leaving or being reassigned would stop the program, you have a single point of failure. A backup can be a second person who knows the task, or a written description that someone else could follow.
Name someone on each side of a handoff. When work passes between organizations, such as from the education provider to the agency's IT office, each side needs one person responsible for the handoff happening. The Technology Infrastructure Contacts and Responsibilities worksheet is one way to record this for network and system components.
Check real capacity. Add up what each person is being asked to do in each month. Then ask them whether it is realistic and what they would stop doing to make room. The Administrative Capacity and Staffing page shows staffing levels and roles for different program sizes. A plan that assumes support nobody has been assigned to provide is a known failure mode.
Say who breaks ties. When two owners disagree or a task is stuck, name who decides, and how quickly they will.
Approvals and partners: plan the conversations
Plan each approval as a conversation with a person, not a box on a chart. In Step 2 you decided who shapes your strategy and who approves it. Here you decide when to approach each of them, what they need from you first, and who makes the ask. The Navigating Approval Chains Workbook maps the usual chain of approvals in more detail, and the correctional and university trackers help you follow each one.
For each person or office on your list, write answers to these questions:
What do they decide, or influence? Do they approve, advise, or have the power to stop the work?
What would they need to see before saying yes? This might be a security review, a budget, a draft policy, or the evidence from your needs statement. If you need to make the case to a particular group, Building Support has pages for wardens and DOC leadership, university stakeholders and IT and security staff.
Who on your team has a relationship with them? Who is the right person to ask?
What is their own calendar? When do they meet or decide, and what else are they responsible for right now?
When will you first talk with them, and when do you need an answer? These are different dates.
What will you do if the answer is "not yet" or "no"? Name the fallback, or the task that would change.
Then look at the whole list together. Some approvals depend on others, because one office may want to see a decision from another before it will act. Mark which conversations have to happen first. If you can, ask people in your agency which approvals have taken longest before, and plan around that.
Talk with people early, before you need their approval. The Ithaka S+R playbook puts it this way: "Bringing stakeholders in early allows you to lean on the knowledge and expertise of others."
Partners belong in this section too. The Partnerships pages have guidance for education providers and for corrections administrators. Your Step 2 choice on dependency named what you rely on from vendors, colleges, funders and other agencies. For each one, write down what they have agreed to do and by when. If an agreement is only verbal, add a task to get it in writing. The MOU template is one way to do that.
Budget and capacity: cost the whole plan
- • Build the budget from your task list. Go through each task and each phase and ask what it costs. Common categories are devices, network, software and licenses, support staff, training, content, security review, evaluation, and repair or replacement.
- • Count staff time. Time from people already on payroll is a real cost even when no new money changes hands. If a task needs someone's time, your plan should show where that time comes from.
- • Organize it by phase. A total does not tell you when money has to be available. A budget that follows your sequence shows when you need funds for purchases, hiring and training, and lets you check that approvals and funding line up.
- • Separate one-time from recurring costs. For each recurring cost, name who pays for it after startup funding ends. If the answer is "we do not know," that is a gap in your plan, and it connects directly to your Step 2 choice on dependency.
- • Include upkeep. The Ithaka S+R playbook says implementation is "long-term, ongoing" and that technology "must be maintained, updated, and upgraded regularly." Check that your budget includes replacement and upgrades, not only the first purchase.
- • Check who ends up paying. Look at whether any cost falls on students or their families, and decide on purpose whether that is acceptable for your program.
- • Use ranges and say where they came from. A figure from a quote, a past purchase or a vendor estimate is different from a guess, so label which is which. Prices change, so note the date you gathered each one.
- • Ask when the budget cycle opens. Some costs may need to be requested a cycle or more ahead of when you need the money. Put that request date into your timeline.
Cost out every task in your plan, including the years after startup money ends. The Budget Planning Complete guide walks through full-cost budgeting. This section shows how to connect that budget to your sequence, your roles and your Step 2 choices.
Data and evaluation: make your criteria measurable
Your data plan turns the scale, change or stop criteria from Step 2 into things you can actually measure. If a criterion has no data behind it, the plan cannot tell you when to act on it. The Data Collection Plan template helps a corrections agency and an education program plan data elements, owners and sharing together.
For each criterion, write answers to these questions:
What data would show it? Include at least one measure of what students learned or achieved, not only activity such as logins.
Where does that data live, and who holds it? It may sit with the agency, the college, a vendor, or on paper.
Can you get it out? If the data lives in a system you do not control, add a task for getting access, with an owner and a date. Your Step 2 choice on data raised this same question.
How often will you look, and who reviews it? Put those review dates into your timeline, tied to the gates you marked.
What will you do with it? Say in advance what result would lead to scaling, changing or stopping.
Then go through the plan and make these decisions deliberately:
Set a starting point. Record where things stand before the program begins, so you can tell later what changed.
Decide what you will not collect. Each data point should have a reason. The Ithaka S+R playbook advises gathering "ethical data about usage and effectiveness from the start," in line with correctional and educational policy.
Decide who can see student-level data, and for how long. This is a place where people who have been through a program should help you decide. We do not state a single answer here. The Data Sharing Agreement guidance can help you put access in writing.
Plan how you will hear from students. The same playbook suggests surveys, focus groups or a student committee, and tracking the "quality of access" and "quality of use," not just whether students had access. The toolkit includes a Quarterly Student Feedback Survey.
Plan the evaluation itself. Name who will do it, whether that person is independent of the program, and when the results will be ready for the review points in your timeline. The Annual Comprehensive Evaluation template is one model.
| What to bring | Where it comes from | How to use it |
|---|---|---|
| Your needs statement | Step 1 | Sets the scope. It tells you who the program serves and what "working" would look like for them. |
| Your seven strategic choices and the reasons for them | Step 2 | Each choice creates work. The next section shows how. |
| Who shapes the strategy and who approves it | Step 2, decision rights | Becomes your roles and your approval schedule. |
| Your criteria for scaling, changing or stopping, and the data for each | Step 2 | Becomes your data plan and your review points. |
| What you still do not know | Step 1, the end of your needs statement | Becomes early tasks, or items in your risk list. |
| Constraints you already know about | Your funder, agency, facility and calendar | Fixes the edges of your timeline: funding end dates, facility schedules, procurement rules, budget cycles. |
| Your Step 2 choice | What it adds to your plan | Questions your plan has to answer |
|---|---|---|
| Purpose | The outcomes the plan is accountable to, and the learning activities that serve them. | Which tasks serve your purpose, and which do not? If time or money ran short, what would you cut first? What can students carry with them after release, and which tasks make that possible? |
| Control | Tasks for whoever owns and manages the devices, the network and the content. | Who runs each of those day to day? What has to be in place before anything else can start, such as accounts or network access? Whose calendar does that depend on? |
| Access and monitoring | Writing and approving rules, security review, user agreements, and training on all of them. | Who writes the rules and who approves them? When do residents and staff learn them? What happens when someone breaks one, and who decides? What happens when filtering or monitoring fails? |
| Scope and sequence | The phases of your work, and the gates between them. | What is in the first phase? What has to be true before you move to the next one, and who checks? |
| Dependency | Backup and exit tasks for each thing you rely on, including vendor contracts. | What happens if the vendor, the funder or your main champion goes away? What is your fallback for each? |
| Data | A data plan: what is collected, where it is stored, who can see it, and how it comes out. | Who collects what, and how often? How will you get the data out to report or evaluate? |
| Decision rights | Roles, consultation points and an approval schedule. | Who is consulted before a decision, who is told after it, and who signs off? Where do students have a role? |
Your needs statement from Step 1 does similar work. It tells you who the plan is for, and its list of what you do not know becomes early tasks: find out, then adjust the plan.
| Column | Why it helps |
|---|---|
| Task and the result it produces | Makes "done" checkable. |
| Depends on | Shows what a delay will hit. |
| Owner | One named person, so nobody assumes someone else has it. |
| Who controls the pace | Flags the tasks you depend on others to move. |
| Earliest start and latest finish | Keeps the uncertainty visible. |
| Gate or review it feeds | Connects the task to a decision. |
| What you still need to find out | Turns open questions into work. |
Risks and backups: plan for what could go wrong
Decide in advance how you will respond when something goes wrong, because something will. Your Step 2 choice on dependency already named what you rely on. This section turns that into specific backups.
A useful way to find risks is a pre-mortem, described by psychologist Gary Klein. Bring the people named in your plan together and ask them to imagine the program has already failed. Each person spends a couple of minutes writing down why. Then go around the room so everyone gives a reason, and keep going until the list is done. Klein advises stating that the plan has failed, rather than asking "what can go wrong?" Klein developed the method, and the evidence he cites for it is limited, so treat it as a good structured conversation rather than a proven tool.
For each risk you list, write down:
How likely it is and how much it would hurt. A rough high, medium or low is enough.
An early warning sign. What would you see first?
What you will do. A specific response, and the task or date it would change.
Who is watching for it. One named person.
Then check the plan for these questions:
What if a key person leaves or is reassigned? Does your backup plan from the roles section hold?
What if an approval takes much longer than planned? Which tasks and dates move?
What if the funding, vendor or partner you rely on changes or ends? What is your fallback?
What if an incident leads someone to restrict access? Decide ahead of time who makes that call, who is told, and how classes continue. The Student Continuity Plan and Security Tool Failure Protocol are templates for this. The Ithaka S+R playbook warns that policies should not "shutdown or shutter education for many if there are transgressions by few."
Keep the risk list alive. Look at it again at every gate and every time the plan changes.
Communication and training: who hears what, and when
Decide who needs to hear what, and when, before changes reach them. Technology changes land on students, instructors and facility staff in different ways, and each group needs to hear about it in a form that makes sense to them.
Build a simple communication list. For each group, such as students, instructors, facility staff, agency leadership, IT, and partners, write down:
What changes for them. Say it in their terms, not yours.
When they will hear about it. Before the change starts, not after.
Who tells them, and how. A named person, and a method that fits the setting.
How they can ask questions or report a problem. And who reads it, and how fast they will answer.
Then check the sequence against your timeline:
Put in place what people need before a new rule starts. If a rule or system depends on something people must have first, such as an account, a login or a device, make sure they have it before you start enforcing. Otherwise the first thing people experience is a penalty for something outside their control. The Student Access Policies page includes guidance on rolling out a policy.
Plan training with the same care as purchases. The Ithaka S+R playbook says to "provide training to all relevant stakeholders," including the "boots-on-the-ground staff from both corrections and education." Name who trains whom, and add those dates to your timeline. The Faculty Orientation Checklist and the Student Preparation & Engagement page can help with content.
Tell people about planned downtime and changes in advance. Decide how much notice each group needs. The Student Continuity Plan includes sample notices.
Plan for hearing back. Decide how students and staff can tell you something is not working, and who will act on it. If you decided in Step 2 that students will share in decisions, this is one place that can show up.
Decide what you will say outside the facility. If families, funders or the public will hear about the program, decide who speaks for it, especially if something goes wrong.
Pilot and the decision to scale, change or stop
A pilot only tests something if you decide in advance what you are testing and what result would change your mind. Your Step 2 choice on scope and sequence says whether you start small. Your Step 2 criteria say what you will judge the results against. This section connects them to dates and people.
If your plan includes a pilot or a first phase, write down the items below. The Implementation Stories page shows one pilot in practice:
What you are testing. Name the one or two questions the pilot should answer.
Who takes part, and how they are chosen. Decide how participants are selected, what they are told, and whether they can say no. People who have been through programs should review this.
What you will measure, and when. Use the data plan above.
What will be different at scale. Think about staffing, bandwidth, approvals and cost. A pilot that works only because of conditions you cannot repeat does not tell you much about growing.
How you will test the setup first. The Ithaka S+R playbook includes an exercise called "Can you break it? Can we fix it?" for trying out a setup before launch. The Setting Up Tech Accommodations guide covers technology readiness for students who need accommodations.
Whether or not you pilot, schedule your reviews. For each one, name:
Who attends and who decides. Use your decision rights from Step 2.
What evidence they will look at. Your criteria and the data behind them.
What each outcome triggers. Say in advance what "scale," "change" and "stop" would each lead to.
Each outcome sends you back into the process. To scale, return to Step 1 with the new group in mind and work forward again. To change, go back to the step where the problem started: Step 2 if a choice was wrong, Step 3 if the plan was. To stop, plan the ending as carefully as the start. Decide what happens to students' coursework and progress, the devices and data, and any commitments to partners, and tell people before it happens.
Put it together: your program plan
Bring the pieces into one plan that someone can use without you in the room. Keep the main plan short enough to read in one sitting, and attach the detail, such as the full task list and budget, behind it. The Implementation Worksheet can help you gather the pieces. Your plan can include these parts:
Where you start. A few sentences from your needs statement and your strategy statement, with the full versions attached.
Phases and gates. What each phase produces, and what has to be true to move on.
Timeline. Tasks, dependencies, owners and dates, with ranges where you are unsure.
Roles. Owners, backups, who is consulted and who approves.
Approvals and partners. The schedule of conversations and what each partner has committed to.
Budget and staffing. Costs by phase, who pays for ongoing costs, and where staff time comes from.
Data and evaluation. What you will measure, who sees it, and when you will review it.
Risks and backups. The list from your pre-mortem, with warning signs and responses.
Communication and training. Who hears what, and when.
Review points. When you will decide whether to scale, change or stop, and what each outcome triggers.
What you still do not know. Each open question with an owner and a date.
Then test the plan:
Next three actions. Can you name them, who owns each, and by when? This is the "done when" test for Step 3.
Someone who was not in the room. Ask a person outside the project to read it and tell you what happens first, who is responsible, and what would make the plan change. Where they are confused, the plan is unclear.
Trace back to your strategy. Can you point to the tasks that carry out each of your seven Step 2 choices? Can you trace every task back to a choice or a need? A task that traces to neither may be there out of habit.
Dates and people. Do the dates respect your fixed deadlines and the real capacity of the people named?
The people it touches. Have students, instructors and facility staff seen the parts that affect them, and did anything change because of what they said?
Problems to watch for
These are the failure modes the toolkit lists for planning, plus two from Step 2 that tend to show up again here. Use this table as a last check on your plan. The full list is in Common Failure Modes.
| Problem | What it looks like in a plan | Where this guide helps |
|---|---|---|
| Underestimating security approvals | Security review is a single line on the schedule with no date for when you will ask. | Approvals and partners; Timeline; Security Implementation Roadmap |
| Single point of failure | One champion, vendor or staff member appears next to most of the tasks. | Roles; Risks and backups |
| Insufficient IT capacity | The plan assumes support that nobody has been assigned to provide. | Roles; Budget and capacity; Administrative Capacity and Staffing |
| Ignoring reentry | Nothing in the plan asks what students can carry forward after release. | How your strategy shapes your plan |
| Pilot without a scale plan | The pilot has no review point and no description of what would justify growing. | Pilot, review and the decision to scale, change or stop |
| Measuring activity instead of outcomes | The data plan counts logins and sessions, and nothing about learning. | Data and Evaluation |
Revisit Your Plan
Treat your plan as a working document, and update it when something changes. The harder question is what kind of change you are looking at, because that tells you where to go next.
| What changed | What it means | Where to go |
|---|---|---|
| A date slipped, a task took longer, a person moved on | The schedule or roles need adjusting. | Update this plan. |
| A choice no longer holds, such as who controls the devices, how the program is funded, or which partner is involved | Your strategy needs a second look. | Go back to Step 2, then revise the plan. |
| The students, their needs, or what you know about them has changed | The need itself has moved. | Go back to Step 1, then work forward again. |
A few habits make this easier:
Name one person who keeps the plan current. Someone has to notice changes and share updates, or the plan quietly goes out of date.
Keep a short change log. Record the date, what changed, why, and who decided. A new team member can then see how the plan got to where it is.
Review on a schedule, and when something big happens. The Ithaka S+R playbook advises that you "reassess your objectives and outcomes regularly and ensure that technology is serving as a means to educational and rehabilitative ends." The Quarterly Review, Annual Comprehensive Evaluation and Sustainability Assessment templates can help you structure reviews.
Tell people what changed. If an update affects someone named in the plan, they should hear it from you before they find out another way.
Sources and Further Reading
The guidance in this guide comes mostly from the toolkit's own Step 1 to Step 3 framing. These outside sources were also consulted, and each is marked with what kind of evidence it is.
| Source | What this guide uses it for | What kind of evidence it is |
|---|---|---|
| Technology Implementation for Higher Education in Prison: A Student-Centered Playbook, Ess Pokornowski, Ithaka S+R, December 9, 2024 | The phase structure, the quotes on stakeholders, training, data, upkeep and reassessment, and the "Can you break it? Can we fix it?" exercise. | A practitioner playbook from a research organization, written for corrections and college leaders. Funded by Ascendium, which also funds this toolkit. |
| Systematic review of the EPIS framework, Moullin and others, Implementation Science, 2019 | The four-phase vocabulary of exploration, preparation, implementation and sustainment. | A peer-reviewed review of 49 projects in public-sector settings. It does not address corrections directly, so applying it to prison education is our inference. |
| Roles and Responsibility Matrix (RACI Chart), UCSF project office | The Responsible, Accountable, Consulted and Informed roles, and one Responsible and one Accountable per task. | Project management practice guidance. The page names no author or date. |
| The Pre-Mortem Method, Gary Klein, Psychology Today, January 14, 2021 | The pre-mortem exercise for finding risks. | A practitioner article by the method's developer. The evidence it cites is one small study of college students. |
Understanding these success factors and common challenges will save you months of going down wrong paths. Most implementation failures aren't technical—they're predictable partnership, policy, and planning challenges that successful programs navigate proactively.
Read this first. It will save you months of going down wrong paths.