Your first 90 days: new program
This is an orientation, not a project plan. It gives you the logic of the sequence — what to do in what order and why — so you can move through implementation without missing critical steps. For the detailed task work, use the tools linked at each phase. Expect 12 to 18 months from concept to first enrolled student.
Know Your Ground
Before you start
New program from scratch — four phases, 90 days to launch. This is an orientation, not a project plan. It gives you the logic of the sequence so you can move through implementation without missing critical steps. For the detailed task work, use the tools linked at each phase. Expect 12 to 18 months from concept to first enrolled student.
Phase 1 — Know Your Ground
You cannot design a program you do not understand yet. This phase is about information gathering — not planning, not pitching, not selecting technology. Resist the urge to move faster. Key rule: Do not select technology during this phase. Programs that choose devices or platforms before understanding their infrastructure and student population consistently encounter avoidable problems.
Build Your Coalition
Phase 2 — Build Your Coalition
Securing the human support your program needs before you ask for formal approval. Approvals from people who do not understand or believe in the program are fragile. Approvals from people you have brought along are durable. Key rule: Engage security before you engage the warden. A proposal that has not been reviewed by the security director will be sent back — and going around them damages momentum. Security directors who co-design security measures become advocates.
Plan the Technology
Phase 3 — Plan the Technology
Technology selection happens here — after you understand your context and have coalition support, not before. This sequencing is not arbitrary: programs that select technology in Phase 1 may regret it, because they end up designing around technology constraints rather than educational needs. Key rule: Get security approval for specific device models in writing before purchasing. Verbal approval is not sufficient. Test software behind the actual facility filtering system — vendor demos are not conducted inside correctional networks.
Build the Infrastructure
Phase 4 — Build the Infrastructure
The physical and technical work of making the program real: configuring systems, training people, preparing students. This is where delays from earlier phases compound. Protect this time — it cannot be compressed without consequences. Key rule: If you are behind schedule, revise your launch date rather than compressing Phase 4. Compressing staff training, systems testing, and student orientation is how programs launch badly and spend months recovering.
Rules & progress tracker
Critical sequencing rules
These are the sequencing failures that appear most consistently in programs that launch badly. Do not do these things:
When you are behind
Note where you are stuck and the next action.
| Your next action | |
|---|---|
| Approvals — the most common delay. Identify the specific person or body that has not moved. Ask your champion to make a call. Review the Navigating Approval Chains Workbook: stall vs. hard no. | |
| Procurement — timelines are largely fixed once started; the error was usually starting late. Check whether cooperative purchasing or state contracts can accelerate the current purchase. | |
| Infrastructure — usually a staffing issue (facility IT capacity or your own). Name the constraint explicitly. Can a vendor or consultant absorb some of the load temporarily? | |
| Partnerships — sometimes the right answer is a direct conversation about whether the partnership is ready to proceed. See the Navigating Approval Chains Workbook for how to distinguish a stall from a hard no. |
Progress tracker
Record actual completion, status, and any blocker for each phase.
| Actual | Status | Blocker | |
|---|---|---|---|
| Phase 1: Know Your Ground (target Wk 3) | |||
| Phase 2: Build Coalition (target Wk 7) | |||
| Phase 3: Plan Technology (target Wk 10) | |||
| Phase 4: Build Infrastructure (target Wk 13) | |||
| Launch (target Day 90) |