Adapt a working program to a new facility — three phases across 10 weeks. Your inputs save automatically and export to PDF.

Auto-save on
Unlocked LabsBreaking Down Barriers Toolkit
Worksheet · BDB-PM-01B
Rev. 2026 — Templates and Tools
Not yet saved
Quick start — Version B

Your first 90 days: expansion

Use this track if you are replicating a working program at a new facility. You already know how to build this — the challenge is adapting to a new institutional context, not starting from zero. For the detailed task work, use the tools linked at each phase.

TrackExpanding to a new facility — three phases.
Time10 weeks — faster than a new program because your systems already exist.
OutputA phase-by-phase progress record for the new site.
Contents
0
What is different in an expansion
1 sections · not started
1
Know the New Ground
1 sections · not started
2
Adapt and Approve
1 sections · not started
3
Configure and Launch
1 sections · not started
4
Rules & progress tracker
3 sections · not started
00
Three phases · 10 weeks

What is different in an expansion

0

Before you start

Use this track if you are replicating a working program at a new facility. You already know how to build this — the challenge is adapting to a new institutional context, not starting from zero.

Program
New facility
Target launch
You have evidence — use it. Your existing program outcomes are your strongest coalition-building tool. Local data from your program is more persuasive to new facility leadership than national research.
You have infrastructure knowledge — you know what works, but do not assume the new facility matches your existing one. Assess it fresh. What worked at facility A is a starting point at facility B, not a guarantee.
Approval process varies — within the same DOC, some approvals may transfer. In a new DOC or state, you largely restart the corrections side. University approvals may already be complete — confirm with your accreditor whether expansion to a new facility requires a new substantive change notification.
New MOU always required — do not reuse your existing MOU without review. A new facility is a new relationship and requires a new agreement.
1B
Weeks 1–2

Know the New Ground

1

Phase 1B — Know the New Ground

Focus on what is different about this facility — not what you already know. Two weeks is enough because you are not starting from zero. Key rule: Your existing champion may not have relationships at the new facility. Find a champion there independently.

Done when
Key tools: Needs Assessment Checklists · Navigating Approval Chains Workbook.
2B
Weeks 3–5

Adapt and Approve

2

Phase 2B — Adapt and Approve

Secure facility approval using evidence from your existing program. The pitch is different because you now have proof. Key rule: Confirm with your accreditor directly whether expansion requires a new substantive change notification — do not assume the answer.

Done when
Key tools: Building Support · MOU Template · Navigating Approval Chains Workbook.
3B
Weeks 6–10

Configure and Launch

3

Phase 3B — Configure and Launch

Technical setup and launch at the new facility. Faster than Part 1 because your systems, training materials, and processes already exist — but do not skip testing. Key rule: Staff at the new facility have not seen this before. Run full orientation and training even if it feels redundant from your perspective.

Done when
Key tools: Ready to Launch Checklist · Data Sharing Agreement Guidance.
04
Reference

Rules & progress tracker

4

Critical sequencing rules

These are the sequencing failures that appear most consistently in programs that launch badly. Do not do these things:

Do not select technology before completing the Needs Assessment — you end up designing around technology constraints rather than educational needs. The sequence in this guide is intentional.
Do not approach the warden before engaging security and IT — a proposal that has not been reviewed by security will be sent back. Going around the security director — even with warden support — damages the relationship you need to sustain the program.
Do not start procurement after all approvals are secured — device delivery takes 4 to 8 weeks minimum. RFP processes take 6 to 12 months. Start procurement conversations during Phase 2, not at the end of Phase 3.
Do not compress the final build phase to make up for earlier delays — staff training, systems testing, and student orientation cannot be rushed without consequences. If you are behind, revise the launch date.
Do not launch without the Ready to Launch Checklist complete — every unchecked item is a problem you will deal with after students are enrolled, which is significantly harder to fix.
5

When you are behind

Note where you are stuck and the next action.

Stuck on…
Your next action
Approvals — the most common delay. Identify the specific person or body that has not moved. Ask your champion to make a call. Review the Navigating Approval Chains Workbook: stall vs. hard no.
Procurement — timelines are largely fixed once started; the error was usually starting late. Check whether cooperative purchasing or state contracts can accelerate the current purchase.
Infrastructure — usually a staffing issue (facility IT capacity or your own). Name the constraint explicitly. Can a vendor or consultant absorb some of the load temporarily?
Partnerships — sometimes the right answer is a direct conversation about whether the partnership is ready to proceed. See the Navigating Approval Chains Workbook for how to distinguish a stall from a hard no.
6

Progress tracker

Record actual completion, status, and any blocker for each phase.

Progress tracker
ActualStatusBlocker
Phase 1B: Know the New Ground (target Wk 2)
Phase 2B: Adapt and Approve (target Wk 5)
Phase 3B: Configure and Launch (target Wk 10)
Launch (target Day 90)
A new facility is a new relationship. Do not reuse your existing MOU without review.

Ready to keep building? Return to Templates and Tools for partnership guides, budget tools, and more.